The ICP (Asset Renewal) Sr. Cost Engineer reports to the ICP Project Manager. The ICP Sr. Cost Engineer shall be responsible for developing and maintaining cost data for the ICP. The ICP replaces end-of-life airport assets, primarily MEP, vertical transportation systems, building enclosure and passenger boarding bridges. The successful candidate will have proven cost engineering experience with complex, multi-phase, multi-million-dollar construction and/or renovation projects. The general job duties include: Prepares detailed computer-generated cost reports, charts and diagrams; Provides analysis and review of cost/budget expenditure and maintains cost control reports; Promptly reports anticipated cost overages or other unsatisfactory cost elements; Maintains liaison with Data Processing in developing support for network calculations, printouts and cost reports, and other cost related services. This is a Full-Time position, with on-site work required Monday-Friday. Note this is a temporary position, with work anticipated to start on 08/25/2025 and end by 12/31/2025.