About The Position

Basic Generator Construction Assembly Duties Sound attenuation installation Pre-Wire alternator (generator end) Pre-Wire control panel and breaker box Install engine and alternator in skid package Install radiator and coolant piping Install muffler and exhaust system and wrap with exhaust blankets Install fuel piping and hoses Install house on skid package Wire engine to control panel and generator to breaker box

Responsibilities

  • Sound attenuation installation
  • Pre-Wire alternator (generator end)
  • Pre-Wire control panel and breaker box
  • Install engine and alternator in skid package
  • Install radiator and coolant piping
  • Install muffler and exhaust system and wrap with exhaust blankets
  • Install fuel piping and hoses
  • Install house on skid package
  • Wire engine to control panel and generator to breaker box
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service