Construction Scheduler

Southland HoldingsGrapevine, TX
7dOnsite

About The Position

Southland Holdings is currently seeking a Construction Scheduler. This position requires a proficient working knowledge of Oracle/Primavera Project Management (P6 v8.3) and an ability to apply a logical progression of construction knowledge primarily in heavy civil infrastructure work.

Requirements

  • Must be able to legally work in the United States.
  • Must have DOT experience.
  • Must be willing to work in a drug-free environment and agree to a post offer drug test.
  • Must be willing to work safely and keep OSHA recordable incidents to a minimum.
  • Experience with self-performing construction activities for heavy infrastructure projects.
  • Mastery of the Primavera Scheduling Software (P6).
  • Experience in change orders and claims management
  • Ability to read and interpret construction drawings and specifications and prepare project schedules with minimal supervision
  • Exceptional attention to detail, with the ability to recognize discrepancies.
  • Strong written and verbal communications skills.
  • Comprehensive knowledge of industry standards and specialty bridge design software; must be proficient with MS Office.
  • Good verbal and written communication skills.
  • Ability to effectively plan and organize to meet project deadlines.
  • Able to interact effectively with others across spectrum of the company.
  • Willing to travel (approx. 20%) to project and project pursuit locations as needed to support project teams and project pursuits.
  • 4-year degree in Civil Engineering or Construction Management or related field and 7 years of related construction scheduling work experience. OR a minimum of 10 years construction scheduling experience with no degree.
  • A Bachelor’s degree in Civil Engineering or Construction Management, or equivalent combination of education and experience.
  • Current driver's license
  • Must have strong business and financial acumen. Should have a strong understanding of engineering calculations, percent complete accounting, cash flow, financial formulas to gauge the health of a project, etc.
  • Ability to solve practical problems and deal with a variety of concrete variables in situations where only limited standardization exists. Ability to interpret a variety of instructions furnished in written, oral, diagram, or schedule form.
  • To perform this job successfully, an individual should have knowledge of database systems, internet software; advanced knowledge of Excel including use of formulas, Word, and PowerPoint Software, and other computer-related concepts.
  • Ability to commute/relocate: Grapevine, TX 76051: Reliably commute or planning to relocate before starting work (Required)
  • Bachelor's (Required)
  • Primavera P6: 1 year (Required)
  • Construction: 1 year (Required)

Nice To Haves

  • Experience in the use of Tilos linear scheduling software is preferred
  • Professional certification such as PSP or PMI-SP is a plus.
  • P.E. licensure in the United States preferred, but not required
  • Project management: 1 year (Preferred)

Responsibilities

  • Develop detailed engineering and construction critical path method (CPM) pre-bid and baseline project schedule(s) (via Primavera) based upon input from estimating representatives and/or contract documents. May assemble data from variety of sources.
  • Resource/cost loading of project schedule(s). Develop baseline and updated cashflow charts/data as requested.
  • Write schedule narratives for Baseline Schedules
  • Work with Project Teams and support them with updates to the project schedule at regular intervals, helping to identify and record the impact of work performed, and/or not performed as scheduled. This includes aiding in the collection of actual dates and quantities installed via field records, progress data supplied by others, and/or visual inspection. Construction Scheduler would also support project teams in updating and maintaining actual costs/resources inputting data consistent with project invoicing.
  • Train Project Team members in the use of P6 Support management through preparation and maintenance of forecasts and schedules.
  • Interface with other departments to provide scheduling/cost data for items such as sub-contract changes requests, bid comparisons, new work item estimates, and resolution of potential schedule/work problems.
  • Provide supervision and/or on-the-job training to clerical and entry level professional personnel assigned to areas of responsibility.
  • Develop preliminary and/or detailed schedules for estimates and work to be bid. Support Estimating Department with schedules for pursuits across the company on projects of all sizes
  • Actively participate in change order and claims management efforts.
  • Coordinate with project teams to analyze delays and impacts and assist in the development of recovery schedules. Support scheduling needs within large Joint Ventures and P3 pursuits.

Benefits

  • 401(k)
  • 401(k) matching
  • Dental insurance
  • Health insurance
  • Paid time off
  • Vision insurance
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service