Director of Data Center Construction & Engineering

Deeter AnalyticsAustin, TX
13dOnsite

About The Position

We are building the infrastructure that powers the future of Artificial Intelligence. We are seeking a seasoned Director of Data Center Construction & Engineering to lead the end-to-end development of our flagship 50MW AI Inference Data Center. This is not a standard colocation build. You will be responsible for designing and delivering a high-density, liquid-cooling-ready facility optimized for massive-scale inference workloads. You will own the roadmap from site master planning and permitting through to commissioning and operational handoff.

Requirements

  • 10+ Years of experience in mission-critical data center construction, with at least 3 years in a leadership role managing projects exceeding 20MW.
  • MEP Expertise: Deep technical understanding of Medium Voltage (MV) electrical distribution and mechanical cooling thermodynamics.
  • Hyperscale/HPC Exposure: Proven experience building facilities for high-density compute (AI, Crypto, or HPC). Experience with liquid cooling infrastructure is strictly required.
  • Financial Acumen: Experience managing CAPEX budgets in excess of $ 100M.
  • Bachelor’s degree in Electrical Engineering, Mechanical Engineering, Civil Engineering, or Construction Management.

Nice To Haves

  • Professional Engineer (PE) license or PMP certification is highly preferred.

Responsibilities

  • Strategic Planning & Design Master Planning: Lead the master planning for the 50MW campus, ensuring optimal utilization of power and space for high-density AI compute racks (50kW–100kW+ per rack).
  • HPC Design Authority: Collaborate with compute architects to design MEP (Mechanical, Electrical, Plumbing) systems that support specific inference hardware requirements, including Direct-to-Chip (DLC) or Rear Door Heat Exchanger (RDHx) cooling solutions.
  • Redundancy Strategy: Define Tier/redundancy levels (N+1, 2N) appropriate for real-time inference SLAs, balancing uptime with total cost of ownership (TCO).
  • Construction & Project Delivery EPC Management: Select and manage Engineering, Procurement, and Construction (EPC) firms, General Contractors, and sub-contractors.
  • Schedule & Budget: Own the capital budget ($XXX M+) and master schedule. Drive critical path activities to ensure "First Packet" deadlines are met without compromising safety or quality.
  • Supply Chain: Manage procurement strategies for long-lead equipment (generators, chillers, CDUs, switchgear) to mitigate supply chain volatility.
  • Power & Cooling Engineering Grid Connection: Manage relationships with local utility providers to secure substation delivery and ramp-up power capacity to 50MW.
  • Thermal Management: Oversee the implementation of advanced cooling loops required for next-gen GPUs/TPUs, ensuring PUE (Power Usage Effectiveness) targets of <1.2 are met.
  • Compliance & Safety Ensure all designs and construction activities comply with local building codes, environmental regulations, and safety standards (OSHA/HSE).

Benefits

  • Impact: Build the physical foundation for the next generation of AI applications .
  • Scale: Manage a massive 50MW greenfield/brownfield project with high autonomy.
  • Innovation: Work at the bleeding edge of data center thermodynamics and density.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service