Position Summary: Responsible for the safe off-loading of Major Components Assemblies (MCA) from sea and road transport jigs onto Final Assembly Line (FAL) transportation trolleys and the delivery of MCAs to the Final Assembly Line stations in accordance with the planning schedule. Safe operations of Overhead Cranes with lifting capacities ranging from 6.5 tons to 50 tons, all with multiple lifting configurations.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED